|

email
| |
JOURNAL
| Follow along as I build the
FFR Cobra replica! Linked below is a day-by-day journal that I've kept of my
progress. It was getting a little long-winded, so I've separated it by months for
convenience. |
May 2000 - Ordering my dream
car!
|
August 2000 - Picking up
the kit, donor teardown, suspension, brakes.
|
September 2000 - Fuel
lines, aluminum, drivetrain installation, heater box, FIRST RUN!!!
|
October 2000 -
Driveshaft, tuning, dash, FIRST DRIVE!!!, wiring, wiring, wiring...
|
November 2000 -
Emergency brakes, Dino's 2-day build, seat rails, pedal mods, overflow tank, lights.
|
December 2000 - Body
mounting, doors, windshield, hood, trunk lid, etc.
|
January 2001 - Sidepipe
alignment, hood hinge rework, door hinge rework, wipers, 02 sensors, body removed for seam
work.
|
February 2001 -
Paperwork, trunk hoop installation, seam filling, remote battery terminals, ceramic
coating.
|
March 2001 - Seam filling,
body prep, door and hood edge prep, defroster duct design and installation.
|
| April 2001 |
|